Every job below is one we do ourselves across Valley Stream.
We excavate the old surface, compact a stone base and lay hot mix asphalt in binder and surface courses. Most residential driveways run 2 to 3 inches of compacted asphalt over 4 to 6 inches of base, more for anything carrying truck traffic.
A new driveway starts with grading the subgrade so water pitches away from the garage and foundation. We tack coat between layers so the binder and surface courses actually bond instead of separating under a tire.
Sealcoating fills the small surface pores that let water and gas soak in, and keeps the sun from drying the asphalt out and turning it gray and brittle. Plan on it every two to three years, sooner if the driveway sees a lot of oil drips or road salt.
Hairline cracks let water into the base, and water under asphalt is what turns a crack into a pothole by spring. We rout the crack, clean it out and fill it with hot rubberized sealant that flexes instead of snapping again next winter.
A pothole means the base underneath has already failed, so a surface patch alone won't hold. We cut out the bad section, rebuild the base and compact new asphalt in so it doesn't sink again in the same spot.
When a driveway or lot is cracked across most of its surface but the base is still sound, we mill off the top layer and overlay with new asphalt instead of tearing out everything down to dirt. It's a cheaper fix than a full tear-out when the subgrade is still doing its job.
Commercial lots need a thicker asphalt section than a driveway because of the weight and turning stress from trucks and delivery vans. We grade for drainage to the catch basins and lay the lot out so water doesn't pool at the low corners.
Milling grinds off the top layer of old asphalt without disturbing a sound base underneath. It's how we prep a lot for resurfacing, and it also fixes a driveway sitting too high against a garage threshold or sidewalk.
Parking lot striping for spaces, fire lanes and ADA-compliant accessible spots, painted once the new asphalt has cured enough to hold the line. We lay it out to the dimensions your lot actually requires, not a generic template.
Not every damaged driveway needs a full repave. If the base is solid under most of it, we can patch failed sections, fix the edges where grass is breaking into the asphalt and reseal the rest.
Four steps, and no surprises in any of them.
You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.
In writing, itemised, free. If something might add cost later we flag it now rather than at the end.
Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.
You point out anything you are not happy with and we fix it before the invoice, not after.
Paving and repair work covers these towns and the area around them.
Questions that come up once a paving project is underway.
Describe the problem and we will tell you what it probably is. No obligation.